Skip to main content

Institutional / project context

Institutional and School Facility Interiors in NYC

Institutional work in NYC is documented through specific records at Our Lady of Lourdes School, Incarnation School, St. Charles School and Bronx Charter School for the Arts. Each card names only its recorded scope; project fit and responsibilities are reviewed individually. An initial discussion starts with the facility address, proposed scope, building requirements and available drawings. The owner defines operational needs; its architect or engineer establishes technical design responsibilities; building management clarifies property procedures; construction coordination follows the authorized documents.

Documented institutional project

Our Lady of Lourdes School.

A dedicated record of institutional painting and surface restoration work in Manhattan. It does not establish other trades, procurement eligibility, certifications or current capacity.

Cafeteria at Our Lady of Lourdes School with newly painted yellow and blue walls
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
School hallway with green accent wall and blue stripe
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Hallway with painted orange band and yellow base stripe
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Painted hallway walls with orange stripe
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Hallway with blue end wall and yellow band
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Blue painted wall and doors with yellow stripe
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Hallway with yellow band and blue base stripe
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Painted stairwell walls and handrail
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Stairwell with yellow band and painted handrails
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Stairwell with orange diagonal band and painted handrails
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.

Who this is for

Clarify the facility and its operating context.

Decision-makers

  • Institutional owners and facility representatives
  • Property and operations managers
  • Architects and designers coordinating an institutional interior
  • Procurement contacts evaluating a specific opportunity, subject to eligibility review

Scope

  • Our Lady of Lourdes School: painting and surface restoration only
  • Bronx Charter School for the Arts: specific supplied flooring, painting, doors and art-room sink records
  • Incarnation School and St. Charles School: specific Archdiocese Catholic school work records
  • Facility scope and current conditions to be confirmed for each opportunity

Additional verified facility records

Bronx Charter School for the Arts

Repeat client since 2023, across two campuses. At 950 Longfellow Ave (Bronx Arts Elementary), July 2023 work included carpet removal, new flooring and baseboards; another flooring week took place in February 2024 during scheduled daytime hours, 8 a.m. to 4 p.m. At 1440 Story Ave (Bronx Arts Middle School), August 2024 work included painting 20+ classrooms with accent walls, finance office 127c, 36 doors (17 classroom, 9 namesakes, 10 office), and an art-room sink replacement. No public review or after photos are presented.

Painted classroom door and frame at Bronx Arts Middle School, 1440 Story Ave
Painted classroom door and frame at Bronx Arts Middle School, 1440 Story Ave
Painted classroom door at Bronx Arts Middle School
Painted classroom door at Bronx Arts Middle School
Painted column in a classroom at Bronx Arts Middle School
Painted column in a classroom at Bronx Arts Middle School
Replacement painting-studio deep sink for brush washing at Bronx Arts Middle School
Replacement painting-studio deep sink for brush washing at Bronx Arts Middle School
Painting-studio brush-washing sink cabinet and new plumbing at Bronx Arts Middle School
Painting-studio brush-washing sink cabinet and new plumbing at Bronx Arts Middle School
See the Bronx Charter School record in project context ↗

Archdiocese of New York Catholic school work

Incarnation School, 570 W 175th St, Manhattan: staircase wall repair on every floor in summer 2023; a faculty bathroom in March 2024 with flooring, door replacement, two new sinks with touchless faucets, paint, lighting and toilet replacement. Work was scheduled outside the school day so the only adult restroom stayed available. St. Charles School, 214 W 142nd St, Manhattan: kitchen wall painting in December 2023, completed January 2024. Our Lady of Lourdes School is a related Archdiocese client, not a campus of either school.

Renovated faculty bathroom at Incarnation School with two touchless-faucet sinks
Renovated faculty bathroom at Incarnation School with two touchless-faucet sinks
Incarnation School faculty bathroom with new plank flooring and toilet
Incarnation School faculty bathroom with new plank flooring and toilet
See the school records ↗

Our Lady of Lourdes School.

A dedicated record of institutional painting and surface restoration work in Manhattan. It does not establish other trades, procurement eligibility, certifications or current capacity.

School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.

Cafeteria at Our Lady of Lourdes School with newly painted yellow and blue walls
Cafeteria at Our Lady of Lourdes School with newly painted yellow and blue walls
School hallway with green accent wall and blue stripe
School hallway with green accent wall and blue stripe
Hallway with painted orange band and yellow base stripe
Hallway with painted orange band and yellow base stripe
Painted hallway walls with orange stripe
Painted hallway walls with orange stripe
Hallway with blue end wall and yellow band
Hallway with blue end wall and yellow band
Blue painted wall and doors with yellow stripe
Blue painted wall and doors with yellow stripe
Hallway with yellow band and blue base stripe
Hallway with yellow band and blue base stripe
Painted stairwell walls and handrail
Painted stairwell walls and handrail
Stairwell with yellow band and painted handrails
Stairwell with yellow band and painted handrails
Stairwell with orange diagonal band and painted handrails
Stairwell with orange diagonal band and painted handrails
See the Bronx Charter School record in project context ↗

Registrations

Corniel Construction LLC maintains a SAM.gov entity record (UEI F7JXHKSUQL94) and is on the New York City Department of Education (DOE) Vendor Portal Bidders List, receiving notice of DOE procurement opportunities.

Review and coordination questions

Confirm the requirements with the responsible parties.

01

Filing and permit questions

The responsible project architect or engineer and applicable agency determine whether a filing applies to the defined scope.

Review filing questions ↗

02

Building and agency requirements

The property team, licensed design professionals and relevant authority identify applicable reviews, life-safety and closeout requirements for the defined scope.

03

Operations and access

Occupancy, building access, protection and operating constraints are confirmed with the facility and project team for each opportunity.

04

Scope and specialist roles

Trade requirements, specialist work and design responsibility must be defined and verified before the company represents capability.

05

Procurement context

Any public procurement requirements, registrations and eligibility must be verified against the specific solicitation before a bid decision.

Documented scope / site questions

Evidence is limited to documented work.

Documented work

  • Our Lady of Lourdes School: painting and surface restoration only
  • Bronx Charter School for the Arts: specific supplied flooring, painting, doors and art-room sink records
  • Incarnation School and St. Charles School: specific Archdiocese Catholic school work records

Questions for the facility team

  • Confirm occupancy, access and protection requirements with the facility team
  • Clarify any site rules, safety protocols and approved work windows
  • Assign testing, remediation, security and specialist responsibilities to qualified parties as required

Project coordination

Confirm the operating facts before planning a sequence.

01Operating calendar, occupancy and access conditions

02Project scope, design responsibility and existing documentation

03Building requirements, protection and trade coordination

04Applicable review, inspection and closeout questions for the project team

Scope and qualification

Scope, eligibility and capacity are project-specific.

Before a project review, confirm the facility, requested interior scope, project team, operating conditions and any applicable solicitation or building requirements.

Do not assume that listed scope, trade capacity, procurement eligibility, schedule or pricing applies to a specific opportunity until it is verified.

Mixed-use planning question

Wet-area questions depend on the actual property and scope.

Institutional premises in mixed-use buildings can be subject to building-specific restrictions. Confirm whether a wet-area change is actually in scope and consult the responsible design and building professionals; do not assume this guidance applies to every facility.

Review mixed-use wet-area context ↗

Evidence boundary

Claims stay within the documented record.

Our Lady of Lourdes School is documented for painting and surface restoration only.

A project discussion starts with facility context, proposed scope, operations contact, design team and applicable building or solicitation requirements.

Institutional planning information

Start with documented scope and current fit.

For a project discussion, contact the team directly with facility location, requested scope and operating requirements. Public procurement eligibility requires separate verification.

Preparing an institutional project conversation

For a facility inquiry in Manhattan or NYC, identify the address, the specific interior scope being considered, the facility’s operating requirements, available drawings and the owner’s designated architect or engineer. Our Lady of Lourdes School is documented for painting and surface restoration only. Share which areas remain occupied and who can answer building-process questions.

Building coordination for institutional interiors

Facility work may involve classrooms, offices, corridors, service rooms and areas used during normal operations. The owner or institution should identify the rooms and intended scope, provide available drawings and name the contact who can confirm building procedures. Its architect/engineer establishes design and technical requirements. Building management or the facility representative confirms access, deliveries, protection and any site review process. Construction questions are coordinated to those current documents and responsible parties.

Where the facility stays occupied, the owner and building team should clarify access routes, which areas are unavailable, protection of adjacent spaces, delivery handling, notices to users and how any interruption to facility operations would be considered.

To organize an initial conversation, provide the school or facility address, scope summary, available drawings, occupied status, relevant photographs, building rules and the owner’s designated architect or engineer.

Have a space that has to stay open while it's renovated?

Send the address, the scope and your drawings or photos. Waldy Corniel reviews every inquiry personally.

We respond within 1 business day.

CallEmailRequest a quote