Esperanza Center, Washington Heights
Documented restroom renovation in 2024 while the agency remained in operation, with dimensioned layouts, charcoal partitions and specified finishes.
Read the Esperanza Center restroom case study ↗Institutional / project context
Institutional work in NYC is documented through specific records at Our Lady of Lourdes School, Incarnation School, St. Charles School and Bronx Charter School for the Arts. Each card names only its recorded scope; project fit and responsibilities are reviewed individually. An initial discussion starts with the facility address, proposed scope, building requirements and available drawings. The owner defines operational needs; its architect or engineer establishes technical design responsibilities; building management clarifies property procedures; construction coordination follows the authorized documents.
Documented institutional project
A dedicated record of institutional painting and surface restoration work in Manhattan. It does not establish other trades, procurement eligibility, certifications or current capacity.










Who this is for
Decision-makers
Scope
Documented restroom renovation in 2024 while the agency remained in operation, with dimensioned layouts, charcoal partitions and specified finishes.
Read the Esperanza Center restroom case study ↗Repeat client since 2023, across two campuses. At 950 Longfellow Ave (Bronx Arts Elementary), July 2023 work included carpet removal, new flooring and baseboards; another flooring week took place in February 2024 during scheduled daytime hours, 8 a.m. to 4 p.m. At 1440 Story Ave (Bronx Arts Middle School), August 2024 work included painting 20+ classrooms with accent walls, finance office 127c, 36 doors (17 classroom, 9 namesakes, 10 office), and an art-room sink replacement. No public review or after photos are presented.





Incarnation School, 570 W 175th St, Manhattan: staircase wall repair on every floor in summer 2023; a faculty bathroom in March 2024 with flooring, door replacement, two new sinks with touchless faucets, paint, lighting and toilet replacement. Work was scheduled outside the school day so the only adult restroom stayed available. St. Charles School, 214 W 142nd St, Manhattan: kitchen wall painting in December 2023, completed January 2024. Our Lady of Lourdes School is a related Archdiocese client, not a campus of either school.


A dedicated record of institutional painting and surface restoration work in Manhattan. It does not establish other trades, procurement eligibility, certifications or current capacity.
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.










Corniel Construction LLC maintains a SAM.gov entity record (UEI F7JXHKSUQL94) and is on the New York City Department of Education (DOE) Vendor Portal Bidders List, receiving notice of DOE procurement opportunities.
Review and coordination questions
01
The responsible project architect or engineer and applicable agency determine whether a filing applies to the defined scope.
Review filing questions ↗02
The property team, licensed design professionals and relevant authority identify applicable reviews, life-safety and closeout requirements for the defined scope.
03
Occupancy, building access, protection and operating constraints are confirmed with the facility and project team for each opportunity.
04
Trade requirements, specialist work and design responsibility must be defined and verified before the company represents capability.
05
Any public procurement requirements, registrations and eligibility must be verified against the specific solicitation before a bid decision.
Documented scope / site questions
Documented work
Questions for the facility team
Project coordination
01Operating calendar, occupancy and access conditions
02Project scope, design responsibility and existing documentation
03Building requirements, protection and trade coordination
04Applicable review, inspection and closeout questions for the project team
Scope and qualification
Before a project review, confirm the facility, requested interior scope, project team, operating conditions and any applicable solicitation or building requirements.
Do not assume that listed scope, trade capacity, procurement eligibility, schedule or pricing applies to a specific opportunity until it is verified.
Mixed-use planning question
Institutional premises in mixed-use buildings can be subject to building-specific restrictions. Confirm whether a wet-area change is actually in scope and consult the responsible design and building professionals; do not assume this guidance applies to every facility.
Review mixed-use wet-area context ↗Evidence boundary
Our Lady of Lourdes School is documented for painting and surface restoration only.
A project discussion starts with facility context, proposed scope, operations contact, design team and applicable building or solicitation requirements.
Institutional planning information
For a project discussion, contact the team directly with facility location, requested scope and operating requirements. Public procurement eligibility requires separate verification.
For a facility inquiry in Manhattan or NYC, identify the address, the specific interior scope being considered, the facility’s operating requirements, available drawings and the owner’s designated architect or engineer. Our Lady of Lourdes School is documented for painting and surface restoration only. Share which areas remain occupied and who can answer building-process questions.
Facility work may involve classrooms, offices, corridors, service rooms and areas used during normal operations. The owner or institution should identify the rooms and intended scope, provide available drawings and name the contact who can confirm building procedures. Its architect/engineer establishes design and technical requirements. Building management or the facility representative confirms access, deliveries, protection and any site review process. Construction questions are coordinated to those current documents and responsible parties.
Where the facility stays occupied, the owner and building team should clarify access routes, which areas are unavailable, protection of adjacent spaces, delivery handling, notices to users and how any interruption to facility operations would be considered.
To organize an initial conversation, provide the school or facility address, scope summary, available drawings, occupied status, relevant photographs, building rules and the owner’s designated architect or engineer.
Send the address, the scope and your drawings or photos. Waldy Corniel reviews every inquiry personally.
We respond within 1 business day.