This page summarizes verified commercial and institutional project records provided for publication. Each record is limited to its documented scope; no broader result is implied.
More verified records
Our Lady of Lourdes School.
A dedicated record of institutional painting and surface restoration work in Manhattan. It does not establish other trades, procurement eligibility, certifications or current capacity.
School-wide interior painting, Aug–Sep 2026: classrooms, hallways, stairwells, main entry and cafeteria, with multi-color stripes, bands and handrails.
Cafeteria at Our Lady of Lourdes School with newly painted yellow and blue wallsSchool hallway with green accent wall and blue stripeHallway with painted orange band and yellow base stripePainted hallway walls with orange stripeHallway with blue end wall and yellow bandBlue painted wall and doors with yellow stripeHallway with yellow band and blue base stripePainted stairwell walls and handrailStairwell with yellow band and painted handrailsStairwell with orange diagonal band and painted handrails
MWW (MikeWorldWide) / 1250 Broadway
Office water-damage restoration in early 2025. The record includes repair and finish work, design and DOB coordination, and building logistics as supplied for this project.
Incarnation School, 570 W 175th St, Manhattan: staircase wall repair on every floor in summer 2023; faculty bathroom work in March 2024 included flooring, door replacement, two new sinks with touchless faucets, paint, lighting and toilet replacement. Work was scheduled outside the school day so the only adult restroom stayed available. St. Charles School, 214 W 142nd St, Manhattan: kitchen wall painting in December 2023, completed January 2024. Our Lady of Lourdes School is a related Archdiocese client, not a campus of these schools. No school staff reviews are presented.
Renovated faculty bathroom at Incarnation School with two touchless-faucet sinksIncarnation School faculty bathroom with new plank flooring and toilet
Repeat client since 2023 / two campuses
Bronx Charter School for the Arts
At 950 Longfellow Ave (Bronx Arts Elementary), July 2023 scope included carpet removal, new flooring and baseboards. Another flooring week took place in February 2024 during scheduled daytime hours, 8 a.m. to 4 p.m.
At 1440 Story Ave (Bronx Arts Middle School), August 2024 scope included painting 20+ classrooms with accent walls (rooms 128, 109, 136, 135, 113, 107, 124, 123, 122, 121, 118, 117, 116, 115, 114 and 110), finance office 127c, and 36 doors (17 classroom, 9 namesakes, 10 office), plus an art-room sink replacement. No public review is presented.
Painted classroom door and frame at Bronx Arts Middle School, 1440 Story AvePainted classroom door at Bronx Arts Middle SchoolPainted column in a classroom at Bronx Arts Middle SchoolReplacement painting-studio deep sink for brush washing at Bronx Arts Middle SchoolPainting-studio brush-washing sink cabinet and new plumbing at Bronx Arts Middle School
Institutional evidence
Verified institutional project records.
Each project record names its own documented scope and does not imply unrelated work or public procurement eligibility.
Office water-damage restoration on the third floor in NoMad. Documented scope includes drywall flood cuts, wall repair, plaster and paint, ceiling tiles, flooring and carpet, kitchen work, and electrical work by a licensed subcontractor. Fontan Architecture handled drawings and DOB filing. Building plan review had no comments in January 2025; DOB approval was February 3, 2025 and permit February 7, 2025. Work was coordinated around freight elevator, Saturday variance, COI/workers’ compensation and trash rules.
Repeat work included dishwasher and electrical items in April 2025 and CEO office carpet in May 2025. Client occupancy and punch-list details are included only as supplied project facts.
“Corniel is amazing I hired Corniel for an 25000 sf corporate office restoration not only did they do a fantastic job they finished 4 weeks ahead of schedule and on budget.”
Barry Neal. Area, schedule and budget are the reviewer’s words, not independently measured claims. Source review ↗
Documented work includes flooring in February 2024; room and door painting and office wallpaper removal in August 2024, with DOE notified; and an art-room deep sink in August–September 2024. No public review is presented for this client.