Skip to main content

Commercial interior references / DOB

NYC DOB Permits for Commercial Interior Alterations

For commercial interior alterations in Manhattan and NYC, the owner’s architect or engineer should confirm the work category, professional responsibilities, filing documents and any permit requirements with current city guidance. This page is a coordination reference, not a filing or code determination.

Classify the proposed work with the design professional

NYC DOB uses alteration project categories. ALT1 generally relates to major alterations including changes in use, occupancy or egress. ALT2 generally applies to multiple work types without a change in use, occupancy or egress. ALT3 generally applies to limited work of smaller scope. The terms are a starting reference, not an independent classification; the owner’s architect/engineer should assess actual existing conditions and scope.

NYC DOB Project Categories: Alterations ↗

DOB NOW Alteration and Alteration-CO

An Alteration filing and an Alteration-CO route are not interchangeable. A change of occupancy or use may raise separate review and certificate-of-occupancy questions. Have the architect/engineer confirm the appropriate NYC DOB filing path and required submissions for the specific property and work.

NYC DOB Alteration-CO and occupancy resource ↗

Permit and asbestos records

Permit needs depend on the filing and work involved. Asbestos documentation may also be required; the owner and design professional should confirm whether ACP-5 or another record is applicable before permit steps proceed. Consult current DOB and DEP requirements rather than relying on a general checklist.

NYC DOB asbestos project requirements ↗ NYC DOB permit guidance ↗

Who coordinates which decisions

The owner authorizes scope and engages the project team. The architect/engineer develops design and establishes professional filing responsibilities. The building supplies property procedures and any owner/management review. The contractor coordinates construction scope to the current approved documents. Agency determinations remain with the city and responsible professionals.

Scope, eligibility and schedule are confirmed for each project; no public-procurement eligibility or certification is claimed.

Have a space that has to stay open while it's renovated?

Send the address, the scope and your drawings or photos. Waldy Corniel reviews every inquiry personally.

We respond within 1 business day.

CallEmailRequest a quote